Home additions in San Diego. More room, on the house you have.

A bedroom, a family room or a bigger kitchen: out the back, to the side or up a story.

AS Builders Inc · CSLB #1114902 · B – General Building. Family-run and bilingual. Hablamos español.

Site photo: a new room with wood floors, built-in shelves on both sides and a wide opening to the next room.
Site photo

A new room, photographed on an AS Builders job site.

Three ways a house grows.

The lot, the house and the City's rules decide which one fits. Need a separate home instead? See ADU construction

  1. Out the back

    A bedroom, a family room or a bigger kitchen, built into the yard behind the house.

  2. To the side

    A new wing where the lot has room along the side of the house.

  3. Up a story

    A second floor when the lot has no room to spare.

Resolve where old and new meet.

An addition affects more than the new floor area. These four connections shape the design, the price and the order of the work.

Roof tie-inWall connectionFoundationUtilities
  • Foundation

    The new foundation and how it sits next to the old one.

  • Wall connection

    How the new framing ties into the existing walls.

  • Roof tie-in

    Where the roofs meet and how water drains away from the roof and site.

  • Utilities

    Electrical, plumbing and heating changes, and whether the house has the capacity.

From open walls to a finished room.

One photo per step, from different AS Builders job sites.

Site photo: new wood framing inside an open wall, with a blue ladder.
Site photo

Framing

Site photo: a finished bedroom with a closet, white doors and wood-look floors.
Site photo

Finished

  1. Site photo: electrical rough-in, a panel and wiring inside open stud walls.
    Site photo

    Rough-in

  2. Site photo: drywall hung in a hallway, with a ladder.
    Site photo

    Drywall

  3. Site photo: rooms prepared for paint, with built-in shelves and drop cloths.
    Site photo

    Paint

Site photo: painted rooms with wood-look floors covered by protective paper.
Site photo

If you stay home during the work.

We plan it with you before construction starts.

  • Temporary access
  • Dust separation
  • A working bathroom
  • The day an exterior wall opens
  • Inspection stages
  • Protection from weather

What moves the price.

Send photos or a video and we give you an average estimate. The exact price comes after we visit.

Send photos for an estimate
  • Size and layoutThe rooms you add and what each one should solve.
  • Foundation and framingWhat it takes to connect to the house you have.
  • RoofHow the new roof meets the old one.
  • UtilitiesElectrical, plumbing and heating changes.
  • Design and engineeringPlans and calculations the City asks for.
  • Finish levelFloors, doors, fixtures and paint.

Permits depend on your city.

San Diego

The City directs one-story additions and remodels to Information Bulletin 140. Its sample drawings are references; the City requires plans specific to your project.

City of San Diego permit guidance

Chula Vista

Chula Vista provides a Residential Addition / Remodel application through Development Services.

City of Chula Vista applications

Confirm the jurisdiction and permit path for your address before setting a construction date.

Request a project review.

Pricing, schedule and scope are confirmed only after we review the project.

Send us photos or a video of your space and we'll give you an average estimate.

Mándanos fotos o video y te damos un estimado promedio. Somos una empresa familiar bilingüe.

The exact price comes after we visit the project.

Text them to (619) 724-3413

Questions

Is a home addition the same as an ADU?

No. An addition expands the existing residence. An ADU creates a separate dwelling. Share how you intend to use the space so the initial review considers the appropriate layout and approvals.

Can you give me an estimate from photos?

Yes. Send photos or a video of your house and yard and we give you an average estimate. The exact price comes after we visit and walk the project.

Can you estimate from a floor-area target?

A target area helps start the conversation, but it is not a construction bid. Connections to the existing house, site work, plans, selections, and exclusions need review before a reliable written scope.

Can I live in the house during the work?

Talk to us about it before the work starts. We plan temporary access, dust separation, a working bathroom and the day an exterior wall opens with you.

Do you speak Spanish?

Yes. AS Builders Inc is a family-run, bilingual company: we speak English and Spanish.

What should I bring?

Your address, the existing floor plan if you have one, the rooms you want to add and photos of the house, yard, roof and access.