Our construction process in San Diego. One step at a time.

From the first conversation to the final walkthrough.

Call (619) 724-3413
Concept: the side yard of a single-story stucco home seen from the driveway, with a neighbor's wood fence, a gas meter, two trash bins, gravel and two succulents.

From the first conversation to the drawings, the frame and the final walkthrough.

The house, step by step.

FramingWaterPower

Build the project.

The drawings become structure, utilities and finished spaces.

What it looks like on site.

Concept: a room before drywall, with insulation batts between wood studs and two blue electrical boxes.

Build the project.

Concept: a new red and blue PEX water line passing through a drilled wood stud.
Concept: a printed floor plan with a pencil and a short stack of flooring samples on a laminate kitchen counter.

Define the work.

Concept: a finished bedroom with white walls, a new vinyl window, a light wood-look floor, a ceiling light and a folded drop cloth in a corner.

Walk through the details.

Review the finished work and the remaining items together.

What to bring to the first conversation.

  • Photos of your space
  • Plans, if you have them
  • What you want to change
Can I stay in my home during the work?

It depends on the rooms involved and the scope of the work. We talk it through when we review your project.

What affects the schedule?

The scope and the rooms involved shape the conversation.